TTG Forestry

Self-Learning and Training Portal

All training resources are available at all times. Choose a topic below and review the material relevant to your work. There are no timers, locked chapters, watched percentages, or required viewing order.

🌲 LRM 📍 Maps and Field Data Collection 💻 Business Applications and Processes

🌲LRM

LRM fundamentals, maps, contracts, support, and troubleshooting.

1 Getting Started Welcome to TTG Forestry and an overview of the systems that support daily work.

Getting Started and TTG Systems Introduction

Switch to full screen for the best experience. Audio on.
2 The LRM Interface Walkthrough of LRM navigation, panels, controls, and the main interface.

Chapter 2: LRM Interface Training

3 Map Update Requesting System and LRM Map Viewer Access maps and layers in LRM Map View, review certification information, and submit map updates.

Map Updates and PAM

LRM Maps and Layers

When using Browser AVD, save temporary files to C:\Temporary and download them through the virtual drive.
4 Silviculture Contracts (PO) Create silviculture contracts from budgeted and non-budgeted activities.

Entering a Silviculture Contract in LRM

5 Harvest Contracts (SO) Create timber sale contracts in the different forms in which they are presented.

Entering a Timber Sale Contract in LRM

6 Contract Map Packages Generate contract map packages in LRM. Map packages are mandatory for timber contracts.

How to Create an LRM Map Package

7 LRM Frequently Asked Questions Common questions about contracts, map updates, blackout periods, vendors, customers, and support.

What if a stand requires site preparation but is still in an active harvesting contract?

LRM allows site preparation and planting activities on stands still in an active harvesting contract when no split or map update is required. A warning may appear. Review the contract and stand details before continuing.

What if timber prices or products change during the contract?

Changes should normally be supported by an amendment. If harvesting has not started, obtain Regional Manager approval by email and contact LRM Support to update LRM and D365.

What if not all stands were harvested?

Contact LRM Support to remove the unharvested stand from the contract. Then update the harvesting activity as canceled or planned, as appropriate, before closing the contract and submitting the map update.

What if patches of timber remain uncut?

Review current imagery with the GIS team and submit the required spatial correction to TTG Edits. Roads and other nonproductive areas should also be identified where applicable.

How do I submit a map or inventory update?

Submit map, inventory, estimate, land sale, silviculture, timber sale, and related record updates through TTG Edits or the Map Update Request System.

What is the blackout period?

The blackout period is used before quarter-end reporting to limit changes that affect reporting. Follow current business guidance for permitted updates during the period.

What work normally needs to go through LRM?

Stand-level silviculture services such as fertilization, inventory, pest control, regeneration, release, and site preparation normally go through LRM. General services not performed at stand level may follow a different process.

What if a vendor or customer is missing?

Vendor and customer setup must follow the approved D365 and compliance process. Once established in D365, the record will later become available in LRM.

What should I do when LRM returns an error?

Review the troubleshooting training below. If the issue continues, contact LRM Support with the error message and relevant contract, tract, or stand details.

8 Troubleshooting LRM Review known LRM issues and practical troubleshooting steps.

LRM Troubleshooting

📍Maps and Field Data Collection

Map Portal, Field Maps, QuickCapture, inspections, infrastructure, and offline work.

9 Using the TTG Map Portal Use the TTG Map Portal, OneHub, or OneMap to navigate maps, layers, and tools.

How to Use the TTG Map Portal

10 Tract Inspections Training and reference material for LRM tract inspections.

Tract Inspections Training

LRM Tract Inspections Guide

TTG field staff topic.
11 Field Maps: Online Use Field Maps while connected to the network.

Field Maps Online

12 Field Maps: Working Offline Download and use maps in areas without reliable data or cellular coverage.

Downloading Field Maps Data for Offline Use

13 QuickCapture Collect points, lines, and polygons in the field with QuickCapture.

Working with the TTG QuickCapture App

14 Collecting Infrastructure Data Collect culverts, bridges, gates, low-water crossings, excavation pits, inspections, and maintenance records.

Using Field Maps to Collect Infrastructure Data

💻Business Applications and Processes

WebDUT, database updates, and the annual budget process.

15 PAM System: Database Update (WebDUT) Use WebDUT to submit contract actuals and related operational updates.

Database Update Template: Web Version

TTG field staff topic.
16 2027 Budget Training New Training Current training for the 2027 annual budget process.

2027 Budget Training

New and highlighted: use this session for 2027 budget training.

Support Contacts

Area Primary Focus Examples Contact
LRM Support LRM functionality and errors System errors, reconciliation, and data entry lrm.support@ttgforestry.com
TTG Edits Maps, LRM datasets, and data maintenance Map updates, shapefiles, and inventory loads ttg_edits@ttgforestry.com
404-789-1951
Contracts Support Contract-related matters Contract setup, corrections, and compliance Contracts.support@ttgforestry.com
IT / Access Support Access, credentials, VPN, and AVD Login issues, cloud setup, and MFA Contact your TTG IT representative or system sponsor.